Case Study – Coca Cola

Project Details

  • Client: Coca Cola
  • Location: UK
  • Programme: Re-Lining & Re-Roofing
Works were carried out to Europe’s largest soft drink production facility; the project value was 850k and consisted of re-lining all gutters, changing 250,000 fixings and the replacement of damaged clad sheets along with the treatment of cut edge corrosion to the remaining cladded sheets. All the logistical implications had to be taken into account and incorporated into the works program so that full 24 hour production could be maintained within for the clients operations and was completed on time and within budget despite the adverse weather that was suffered throughout the works.
It was down to Avonside Roofing’s experience both commercially and domestically in the industry, along with the assurances that we would complete on time that Coca Cola awarded us with the contract and all their needs were met throughout.

Quick Contact

Need Any Assistance?

With 38 branches nationwide, a member of our dedicated & highly experienced team of experts will be on hand to help.

Contact Us